السيرة الذاتية ( hossam )

الهدف الوظيفي
Instrument control supervisor

الخبرة 15 سنة و8 شهر.
Instrument Field Engineer ( Bechtel National Inc )
2018-05 - الي حد الأن
Responsible for all F&G Detection and fighting Field &buildings.
Site surveys, index, cable block diagrams, instrument location layouts, cable routing, cable schedule, wiring diagrams, loop diagrams.
Supervising Construction/Commissioning Activities.
Preparation of as builtDrawings.
Supervision of Calibration of Instruments and Verification of test Reports.
Progress reporting to the Construction Manager on Daily, Weekly and Monthly basis.
Carry out inspection, surveillance witnessing of contractor activities, ensuring records are maintained, including as-built data.
Ensure overall construction is executed in accordance within applicable specifications, drawings, codes and standards and to the requirements of the Contract.

Instrument Supervisor ( GS ENGINEERING & CONSTRUCTION )
2017-07 - 2018-05
LoopChecking, commissioning fire detection and fighting System startup
Checking onsite and confirming the installation as per project documents and standards
Supervising and monitoring loopCheckingfor IO signals with the central control room(Honeywell DCS system) and (ESD /F&G PLC HIMA system) and (Allen Bradley LOGIX 5000 system for all Packages)
Participate in daily and weekly meetings with client and consultants
Supervising and monitoring the work of Sub contractors as per project schedule
Update Asbuilt of instrumentation cable termination drawings and Layouts
Verify all Instrument mechanical completion activities performed by the Construction Contractor including approval of punch lists
Ensure that the works proceed in conformity with the pre-commissioning schedule, and report any deviations to the Area Superintendents
Participate to the review and approval of the Yard tubing testing and cable testing procedures.
Review and approve Hazardous Area Instrumentation Installation Inspections Test Reports (EX ITRs).
Commission systems/subsystems in accordance with the commissioning procedures and commissioning and start-up schedule
Assist Vendor servicemen with their commissioning a

Instrument Supervisor ( ADVANSYS PROJECTS )
2016-09 - 2017-04
Supervised installation for new system fire and gas detection and fighting indoor/outdoor for Hotel HILTON TABA

Instrument CommissioningSupervisor ( ON-SHORE JV (ENPPI and TOYO) )
2016-06 - 2016-08
Supervised installation and over handling and calibration pneumatic and electronics and hydraulic Instrument
Hands on Experience of calibration configuration, of various types pressure, flow, level, temperature transmitter and controller (Pneumatic, Smart field bus)
Verifying Loop check for all on &off skid instruments
Verifying the instrument functionality and the system logic integrity forHART based instruments.
Verify cause and effect matrix for all on off skid instruments
Responsible to check and verify the functionality of the field utilities (Air Compressors, AirDriers, Analyzers

Instrument Supervisor ( INSTRUMENTATION & AUTOMATION & ESTjoint venture (ARAMCO) )
2015-04 - 2016-05
Implement and configuration for signals communications between 12 HVAC units type (EMERSON)
Which have signals communicate for DCS system Type (Invensys) and other signals for alarms and trip
Communicate for ESD system Type(Triconix)

F&G instrument commissioningSupervisor ( Enppi Engineering for the petroleum & process industries joint venture (SHELL) )
2014-05 - 2015-02
Preparation of cable schedule
Installation, Loop Checking and commissioning for Addressable system simplex
Installation, Loop Checking and commissioning for & VESDA system
Megger continuity test for all cable’s I/O’S signals AS shell standard
Installation,Alignment, LoopChecking, commissioning for Dragger,Det-tronics open path gas detectors
Installation, calibration, commissioning for Det-tronics , Net safety spot type gas detectors
Installation, commissioning for Det-tronics , Net safety 3IR flame detectors
Installation, commissioning for firefighting deluge, Self-Oscillatingmonitors, (FM200, CO2&sprinkler systems)
Installation, commissioning for Heat detectors(Addressable,Conventional, LHD)
Assist Vendor servicemen with their commissioning activities

instrument commissioning Supervisor ( Enppi Engineering for the petroleum & process industries joint venture (BP) )
2013-09 - 2014-05
Preparation of cable schedule
Installation and Calibration of all Instruments and Fire & Gas Devices
Installation and commissioning for gas detectors-open path gas detectors, spot type (Honeywell)
Installation and commissioning for CCTV micropackFDS301 Visual Flame Detector
Preparation of inter connection wiring diagrams
Participate in daily and weekly meetings with client and consultants. Supervising and monitoring the work of Sub contractors as per project schedule. Preparation of work permits and approval
Loop Checking, commissioning fire detection and fighting System startup
Installation and commissioning for ENERGEN firefighting system
Commission systems/subsystems in accordance with the commissioning procedures and commissioning and start-up schedule

F&G instrument commissioning technician ( Enppi Engineering for the petroleum & process industries joint venture (E- Styrenics) )
2011-10 - 2013-08
Calibration all instruments transmitters, control valves (foundation fieldbus)
Commissioning and start up for Silos plant through Siemens Step 7-300 with the central control room.
Calibration and commissioning for gas analyzer which measure oxygen Concentration in styrene, ethyl benzene tanks
Commissioning and start up for bagging system
Installation,calibration, alignment for all Gas and Flame detectors
Loop Checking, commissioning fire detection and fighting System startup

Instrument / fire &gas senior technician ( Enppi Engineering for the petroleum & process industries joint venture (E-gas) )
2011-08 - 2012-02
Calibration all transmitters, Pressure, flow, level, Temperature, Vibration
Commissioning all instruments for 4 Gas Compressors GE frame 7 and utility system
Commissioning all detectors Smoke, heat, gas, flame, indoor and out door

instrument and electronic workshop maintenance ( EMC joint venture LNG (UNION FENOSA) )
2010-02 - 2011-06
Responsible for workshop calibration and maintenance
Responsible for maintenance and calibration of all instrumentation in the field
Calibration all devices including transmitters, measurement devices, and control valves
Maintenance as procedures for preventive and corrective maintenance of Automation Control System
Maintenance all types of instruments transmitters; control valves pneumatic, smart types
Maintenance, calibration, alignment for all open path gas detectors types

senior instrument Commissioning technician ( Yemen gas LNG joint venture (Technip) )
2009-06 - 2010-01
Loop Check, Pre-commissioning and start-up for field utilities (Air Compressors, Air Driers,Nitrogen,Steam boilers)
Commissioning and start up for Nitrogen plant through Allen Bradley PLC LOGIX 5000 with the central control room
Commissioning and start the up for Motorized valves with the Central control room
Commissioning and start up for Fire and Gas (open path gas detectors, IR gas detectors, and flame, heat detectors with the central Control room
Commissioning and start up for Steam boilers with the central Control room
Also participate in Operation maintenance and trouble shooting for utility area
Preparation of work permits and approvals
Preparation of daily and weekly report

Instrument foreman ( Bapetco joint venture (shell) )
2006-10 - 2009-05
Working a Different Scenarios of Oil wells: Gas Lift, ESP Pump, waterinjection
Preparation, installation for (oil & gas) Baker wellhead Hydraulic control panel, commissioning start up
Preparation of Hook-up diagrams
Planning and scheduling of daily activities
Calibration for all instruments transmitters, pilots, control valves, pneumatic controllers
Loop Checking, Pre-commissioning and System start-up

instrument technician ( Abu Madi Gas Field joint venture (Eni) )
2002-11 - 2006-06
Preparation of work permits and approval
Preparation of cable termination schedule
Calibration for all instruments and switches for 3 Gas turbine nuovopignone
Adjust axial Bentley Nevada probes control and monitoring with system control room
Loop Checking, Pre-commissioning and System start-up